Nick Spano Grants to Greenburgh Lifted After Senator Loses.

Hits: 0

WPCNR’S THE FEINER REPORT. By Greenburgh Town Supervisor Paul Feiner. January 12, 2007: My office received a disturbing call from Kim Conklin of the Department of State. Last year Senator Nick Spano awarded the town $126,000 for a generator and a music lab at the Theodore Young Community Center. In November the Senator lost his re-election campaign. What happened? We were advised that all grants that were awarded in 2006 by the Senator’s office prior to the election were withdrawn.

The town relied on receiving this grant to fund both programs.  Two years ago – immediately after the Senate election was disputed – I received a call from a non profit organization in Ardsley that had received a substantial pre-election day grant from the Senator. The grant was in jeopardy. After the election was certified the grant was awarded.


This is politics at its worst. This highlights the need to reform the way Albany does business. I am hopeful that Senator Andrea Stewart Cousins office will be able to help. I am confident that she will be an important voice for government reform.

Posted in Uncategorized

Are You Ready for Some Commentary? Jim Benerofe Is Back on Monday Night.

Hits: 0

WPCNR WHITE PLAINS WEEK NEWS. January 12, 2007: The Dean of Journalism in White Plains, Jim Benerofe returns to the White Plains Week News Team Monday evening at 7 PM on Cable Channel 76. WPPA-TV. Benerofe reunites with John Bailey, The CitizeNetReporter, and Peter Katz, “The Anchor for All Seasons,” to discuss the city hall cast of acting commissioners, the Schools Strategic Plan, Assessments, and the school budget. The show will be cablecast Monday at 7 PM on “The Spirit of 76”.


 



Former National Network Correspondent, Peter Katz, welcomes “The Old News Ranger,” Jim Benerofe back on White Plains Week Monday night for his take on the business and development scene in town.


Photo, White Plains Week

Posted in Uncategorized

North Broadway Civic Association to Rethink Variance for 35 Orchard Street

Hits: 0

WPCNR NORTH BROADWAY BEACON-SENTINEL. By John F. Bailey. January 11, 2007: Lively jawboning by Councilpersons Rita Malmud, Tom Roach (who lives in the North Broadway area), Benjamin Boykin and Arnold Bernstein swayed the North Broadway Civic Association away from endorsing  a zoning variance requested by a developer that would allow him to convert 35 Orchard Street to office use. The property formerly the home of the American Lung Association was purchased recently for $800,000 by the developer, Angelo Monaco.  



Location of American Lung Association house that is proposed to be turned into a commercial office. The developer has promised upgrading the reported deteriorated building and $10,000 of landscaping for Orchard Street. Google Capture by WPCNR.


Rita Malmud said this was the first time in her seventeen years on the Common Council that any neighborhood had supported turning residential property into commercial property, noting it was a “slippery slope,”  that could set precedent throughout the city for similar conversions. Benjamin Boykin echoed Councilperson Malmud’s sentiments, remembering how the council had voted down a similar rezoning on North Broadway adjacent a bank several months ago. Arnold Bernstein, the Councilman, voiced his concern for maintaining the quality of the neighborhoods.


Tom Roach, who lives in the immediate area was most concerned, calling the request for a variance before the ZBA “an end run,” noting that the developer going to the Zoning Board of Appeals without endorsement from the neighbors would have to prove he had not created a “self-handicapping situation,” as well as being subject to the ZBA’s challenge to grant a variance with the least impact on the neighborhood.  



Beil said the committee that had reviewed the developer’s proposal felt that the property was deteriorated and by allowing the variance with a prohibition on medical use, the neighborhood would be improved. Beil said the committee was afraid of what might happen to the property if it was simply rented to a residential tenant.  Beil attempted to call the vote, but after the Councilmembers spoke strongly against the variance approval, the auditorium of about 35 residents seemed very cool to the idea. Beil said at the close of the discussion, the Board and the committee would look more into the issue and not decision would be made that evening. Photo, WPCNR News


 

Posted in Uncategorized

DOT Promises Citizen Role Landscaping Exits 7 & 8 Devastation.Bradley Steps In.

Hits: 0


WPCNR BUMPER TO BUMPER  By John F. Bailey. January 11, 2007, UPDATED 12:16 PM EST: Nicholas Choubah, Regional Structures Supervisor for the Department of Transportation promised the North Broadway Civic Association tonight a role in planning how the devastated Cross Westchester Expressway- Central Westchester Parkway-Grant Avenue, Ebersole Rink corridor will be reforested after construction of the  entrance and exit at Exits 7  Westbound and Exit 8 Eastbound is completed.


It was also disclosed to WPCNR by Mark Triano of the DOT  that the work once completed had no built-in adaptibility to any possible Tappan Zee Bridge, Cross Westchester Expressway expansion to include light rail, it would all have to be done again to fit Tappan Zee expansion plans for the Cross Westchester corridor.



“Deforestation” of Exit 7-8 Northside of I-287. WPCNR believes this is adjacent the Ebersole Ice Rink. DOT promises landscaping will begin 2009. North Broadway Civic Association was promised a role in contributing to the relandscaping with a preliminary plan tentatively promised for their review within two months. 


Photo by Don Hughes for WPCNR



Adam Bradley, Assemblyman of the 89th District, brought Nicholas Chouba, center and Mark Triano of the New York State Department of Transportation to address the devastation of the North Broadway corridor above the DOT I-287 Construction. Photo, WPCNR News




State Assemblyman Adam Bradley facilitated the meeting between residents shocked at the naked earth surrounding both banks adjacent I-287, where there used to be trees, forest and cliffs and the DOT. A DOT official agreed that within two months he’d ask a DOT landscape design team for a preliminary plan, which the North Broadway Citizens Association would be given the opportunity to  review.

At first Choubah and Mark Triano of the DOT said residents would not see a plan for landscaping the area surrounding the Cross Westchester Expressway West and Eastbound in the vicinity of Ebersole Rink until September of 2009. Choubah said about $500,000 to $800,000 would be earmarked for replanting the slopes now bare of trees which were “deforested” by construction of the aerial-visible Tennessee Valley gas pipeline and the new entrance and exit ramp construction undertaken by the DOT. Assemblyman Bradley said that it was not a matter of money, but rather what the final project would look like that would determine the landscaping plan. He insisted the residents be given input in how their neighborhood would be restored.



Gutted Cliff at Entrance to I-287 Eastbound off North Broadway.


 Dec. 24 Photo  by Don Hughes for WPCNR 




Choubah said the DOT procedure in the past is to complete the project then commission an outside landscape contractor to relandscape the bare slopes. When Terry Conroy stood up and asked incredulously that the DOT honestly had no idea how they would relandscape the area when they have construction-designed every other aspect of the project, Mr. Choubah changed his tune and agreed to go back to the DOT and ask permission to have the DOT design department develop a preliminary plan.

Adam Bradley mediated between the two sides, and asked residents to call his office and report their concerns as the relandscaping plan developed.

Residents described the construction as a “deforestation.”  Part of this, Choubah blamed on the Tennessee Valley Authority relocation of their gas pipeline which, in order to be visible from the air, he said, had to clear the area surrounding the new pipeline route. Joseph Nicoletti, White Plains Commissioner of Public Works, commented that the Tennessee Valley Authority, the pipeline company, had told him they planned to replant the area around the pipeline right of way with shrubbery.

Choubah committed to a preliminary landscape plan within “a couple of months,” provided he got permission.


 



View of North Broadway Neighborhood looking South at the Entrance to I-287 Eastbound.


Dec. 24 Photo by Don Hughes for WPCNR


Citizens, numbering about 40, (including six Common Councilmembers, Mr. Bradley, and County Legislator Bill Ryan), said that a number of mature trees had been cut down, and replacing them with saplings and small shrubs would not compensate. Choubah said it has been the DOT experience that large trees did not plant well in relandscaping projects of the past.


What came out of the meeting was a commitment by Choubah to neighborhood involvement and approval of reforestation efforts, but that the area would remain in its defoiliated state for at least two and a half years, the relandscaping not expected to begin until fall of 2009.


Mark Triano, Mr. Choubah’s construction manager for the project told WPCNR after the meeting that the Exit sequence when completed would eliminate the weaving pattern of westbound traffic exiting across entering traffic at the entrance to I-287 at the city’ s eastern gateway.



The offending Entrance/Exit Combination began construction last September with this ghastly traffic pattern first pointed out by WPCNR. Photo,  WPCNR News Archive





Posted in Uncategorized

Ryan Appoints Pinto Legislative Chair

Hits: 0

WPCNR COUNTY CLARION-LEDGER. From Legislator Bill Ryan’s Office. January 11, 2007: Westchester County Board Chair Bill Ryan (D-I-WF, White Plains) appointed County Legislator Vito Pinto (D-I-WF, Eastchester) Chair of the Board’s Legislation Committee, effective January 10.  Pinto has given up his current position as Majority Whip to assume the position. He replaces Legislation Committee Chair County Legislator Clinton I. Young, Jr. (D-I, Mt. Vernon) who was elected the Board’s Vice Chair at Monday’s Board meeting.

“We have a great deal of important work ahead but right now, the most pressing task at hand is the legislative package we’re putting together to bring to Albany,”  said Pinto. “We have many important issues on the table, including significant public safety measures as well as several initiatives that would lead toward critically needed property tax relief. I’m hopeful that with the new governor, we will have a very productive year.”


Pinto, a Tuckahoe native, was the first Democrat to be elected by the 10th District. Prior to his election as County Legislator in 1997, Mr. Pinto served on the Tuckahoe Village Board from 1983-1985 and the Eastchester Town Council from 1985-1997. He enjoyed a 32-year career in education, retiring from the Tuckahoe School District in June 2002.


During his tenure on the Board, Pinto has chaired the Committee on County Officers and Departments, the Public Works Committee and the Parks Committee.  A Vietnam War veteran, he is an outspoken advocate for veterans’ issues. He’s a staunch supporter of issues related to senior citizens, youth, the disabled, the County’s parks and public safety. Pinto sponsored legislation to keep guns out of the hands of kids and has successfully urged the County to upgrade its emergency response services. He is the Board’s liaison to the Westchester County Parks, Recreation and Conservation Board.


Legislator Pinto is a 1958 graduate of Tuckahoe High School. He earned his BS Degree in Industrial Arts Education from SUNY Oswego and a Masters in Guidance and Counseling from New York University.

Posted in Uncategorized

Tentative Assessment Roll Appears in Decline for 5th Straight Year

Hits: 0

WPCNR QUILL & EYE SHADE. By John F. Bailey. January 11, 2007: The 2007-2008 Tentative Assessment Roll examined by WPCNR shows the city tax roll declining $1.7 Million from last year. If the present Assessment Roll holds it makes the fifth straight year of decline despite five years of White Plains “Renaissance.”  The Assessment Roll may decline or advance depending on any challenges coming up on January 22 when the Board of Assessment Review meets to hear property owners’ complaints.


The total City Taxable Property is tentatively assessed at $294,419,383, declining $1,735,181 from last year when the total city assessed property was $296,154,564. The decline is a combination of city settlements reducing assessments on tax certioraris and the state set equalization rate. School Taxable Property is figured at $281,952,580. City Taxable Property, $281,952,580.



According to Jacqueline Mackin of the City School District Business Office, the School Taxable property Past year was $298,126,000. Mackin said the tax rate is determined by the total of the City Taxable Property Assessment Roll, and the school district taxes different segments of the roll than the city does. Mackin said the School District never gets the total assessment figure until March.



The City Tentative Total Assessment Roll at this point continues its decline from $318,804,180 in 2002-03, a five year total decline in assessments of $24.3 Million.


Since 1991 total assessed value in the city was $433,240,91& As of today, prior to the city settling assessment challenges in the next two weeks, there has been a decline of $138.9 Million in assessed value, while full valuation of property has risen from $3.7 Billion in 1991 to $8.5 Billion in 2006.


According to a Legal Notice, The City Board of Assessment Review will meet January 22 from 3 to 5 PM and 7 to 9 PM to “hear complaints in relation to assessments of real property in the Assessor’s Office.” The Tentative Tax Roll is available for review as well as individual property assessments on the public computer until that date in the Assessor’s Office.

It is too early to lock in the assessed value until the Board & Assessment Review reviews expected challenges.

Posted in Uncategorized

Preliminary 07-08 School Budget: $175M to $182M. $200 Million Looms in Sight.

Hits: 0

WPCNR SCHOOL DAYS. By John F. Bailey. January 10, 2008: The Board of Education got its first look at Assistant Superintendent for Business Fred Seiler’s Preliminary Budget of 2007-2008 expenses which topped out at $182.2 Million (a 9.8% increase – including projected salaries).


 


Superintendent of Schools Timothy Connors remarked to the television audience that since The CitizeNetReporter was present and would probably write a story, that it should be pointed out that this figure was expected to and may go down to only a 5% increase or $174 Million.


 


The School Budget is on track to top the $200 Million mark in 2008-2009, and definitely by 2009-2010, even at a 5% rate of growth.


 


 



The Major Increase is in “Other Expenses,” and $8 Million of that is in a one time payment of $8 Million in new certiorari refunds expected in 2007-2008. Seiler notes that if the district bonds that amount the budget could dip to $175 Million. Photo, WPCNR News


The pattern duplicates the Preliminary Budget of last year which came in at $15 Million over 2005-2006 when it checked in at over $169 Million and was trimmed to $165.8M.  The 2007-2008 Preliminary Budget is coming in $16 million over the present budget ($165.9M).


 


Projected into the future, at a flat 10% a year increase the budget will top $200 Million in 2008-2009 two years from now – barring any new programs and new capital construction. If the school district trims the increase in expenditures to 5% a year the $200 Million threshold will be breached in 2009-2010.


 


An estimate of the tax rate is not possible because the amount of assessibles in the city has not been determined yet. Decline in assessibles has contributed to school district and city budget woes the last few years.


 


To Bond for Certioraris or Not to Bond.


 


Seiler said that the main driver of the budget was his proposed strategy of paying an expected $8 Million certiorari bill in 07-08 out of the budget instead of bonding for the expected refund as the district is doing in the current budget.


 


Seiler told WPCNR Wednesday that if the Board of Education changes its mind and decides they would bond for the $8 Million (or possibly more, Seiler said), that the budget would drop from $182.2 Million to about $175M.  The Seiler strategy of paying certioraris out of pocket instead of pushing them out over five years echoes a recommendation of Richard Hecht in regard to the bonding of the Capital Project, in which he recommended paying debt off sooner rather than later.


 


On the matter of District Salaries, Seiler is projecting an increase of 3.2% over the entire district. Seiler said the 3.2% ($96 Million figure ballpark) does take into account expected teacher contract increases. Seiler said that it should not be taken to mean that teacher salaries would be held to a 3.2% increase. Seiler reports negotiations will begin in earnest in two months, but he expected the total salaries in the district not to increase more than the 3.2%.


 


Debt service increase Projected at 30.26%


 


The Preliminary Budget, (not shown on projection slides to the audience), shows the Debt Service increasing from $5.9 Million to $7.7 Million.


 


Seiler said that includes the new bonding for  $8 Million in certioraris in the 06-07 budget plus $1.7 Million in debt service expected for the first year of the Capital Project (Athletic Fields and High School Renovations). 


 


Seiler said that in 2008-2009, another $1.7 Million would come on board for the second portion of the $66 Million Bond, followed by a third $1.7 Million or more debt service increase in 2009-2010 when the third $20 Million chunk of the bond is planned to be floated. That is, assuming 5% interest rates and the present School District Bond Rating.  


 


Seiler noted to the audience that the Board of Education could choose to ease the impact on the year-to-year budget by opting to bond the new $8 Million in Certiorari expected by the School District in the year 2007-2008. That would increase the debt service slightly, while taking $8 Million out of the “Other Expenses” budget.


 


Seiler said he expected Utilities to decrease 27% because original projections expected them to be higher, and there would be less payments for tuition (sending students out of district)


 


Transportation is going to increase 9.54%. The Board voted an additional $164,000 for Transportation this evening to provide for Middle School busing.


 


An estimate of revenues was not provided.

Posted in Uncategorized

Planning Expert: Schools Must Be Willing to Change System to Plan.

Hits: 0

WPCNR SCHOOL DAYS. By John F. Bailey. January 10, 2007: Dr. Stephen Barone, the school district strategic planning consultant, challenged an intrigued audience of 31 White Plains parents, a half-dozen district personnel, including a teachers union representative,  to be willing to change their system to prepare an effective long term Strategic Plan.


 



Dr. Stephen Barone, Transformation Systems, Ltd. Telling it Like It Is Monday Evening at the Board of Education. Photos, WPCNR News


 



A core group of parents and residents listened raptly to Dr. Barone’s one hour presentation will be seen on WPPS-TV, Channel 77, possibly beginning this evening. Dr. Barone appears about one hour into the meeting.


 


Speaking bluntly, Barone  said “The people within the system are the last to see the crisis,” noting the decline of well known institutions such as General Motors, the Soviet Union, Smith Corona, Polaroid and the telephone industry, “because the people within the system are fighting to keep the system the way it is.”  He challenged the district to involve their critics in the Strategic Plan Core Team, and be willing to listen and accept their ideas.


 


 


Teresa Niss, the arts coordinator for the district, Superintendent of Schools Connors said was the person to contact for any citizens wishing to be on the Strategic Core Team and supplemental planning and implementation committees. Ms. Niss may be e-mailed at  teresaniss@wpcsd.k12.ny.us  to express your interest in participation,  or Michele Schoenfeld may be contacted at 422-2071, or the Superintendent’s office may be emailed at timconnors@wpcsd.k12.ny.us. .


 


Timetable


 


Barone said the strategic plan process would last through November of 2007. He reported the first opportunity for the community to get into the process will be on Tuesday, January 24 at 7 P.M. at the World Café Session at White Plains High School.


 


 He said Planning and Action groups would be formed to implement the Strategic Plan once the Strategic Plan Core Team develops the plan. The Planning and Action Groups, Superintendent of Schools Connors said would consist of school administrative personnel since they involved action on the part of district employees.


 


 Barone described what was in store for Mr. and Mrs. and Ms. White Plains at the World Café Session January 24. He described the format as participants sitting at tables for a timed interval then moving to the next table to a new mix of people and exchanging ideas on issues facing the district to generate ideas, opinions, directions.  Barone’s “facilators” would record the interplay of ideas and present them to the Strategic Core Group in February who would extrapolate “directions.”


 


Another device for input of the citizens will be a survey which citizens may take online beginning January 15, according to Superintendent of Schools Timothy Connors, on the City School District website, www.wpcsd.k12.ny.us.


 


Complacency Defeats Effective Strategic Planning


 


Barone has worked as a teacher, a principal and a Deputy Superintendent of Schools. His firm which he founded in 1988, Transformation Systems, Ltd., has facilitated strategic planning for  schools in Italy, Spain, France, Pakistan, Saudi Arabia and school districts around the country, he told the audience. He emphasized that because conditions in the district work now, is no guarantee they will stand the test of the future.  He cautioned that “implementing strategic plans, is more important than having a plan,” and that “organizations that are complacent are in trouble,” noting that the basic education model in the country has not changed in 125 years.


 


Barone explained that the process of strategic planning “makes it possible to think outside the system.” Using his own personal weight and habits as a metaphor, Barone said his overweight was a product of his habits, and unless he is willing to change his habits of eating and exercise, he was not going to lose weight. He applied the same metaphor indirectly to the White Plains City School District, noting, “sometimes a system perpetuates a habit.”


 


Mindset: Nothing is Off Limits.


 


He encouraged citizens to get involved in the World Café night and the survey, and pleaded with administrators involved to go into the strategic planning process with the attitude that “nothing is off limits…including how we negotiate contracts,” as an example.


 


When two citizens brought up the notion that older teaching methods in grammar and math should not be thrown out, Barone disagreed, telling them that “you would not pass a Junior class math test today.” (This reporter would have to agree.)


 


The past is not the future. Leaders find the future.


 


“To honor the past, just because it was the past, is wrong,” Barone said, noting setting a goal is not the object of strategic planning, but in implementing steps to reach that goal, otherwise, he said “old habits (of the district) reclaim us, unless we develop new habits to replace them.”


 


Barone said most organizations go about business as usual unless they are confronted with “a sense of urgency” to change. He singled out General Motors as a company that suddenly has a sense of urgency, cautioning the district, “People inside the system are the last to see the crisis. To be a leader (meaning the School Board, the administration, the community) you have to be going someplace. You have to know what you’re doing to go some place. Leaders find a way to…a target so high that we won’t achieve it unless we change. That’s what leaders do. Leaders are looking long term.”


 



Some cautions about what Strategic Planning Can and Cannot do.


 


Liking the present district to a blue box, Barone said, “all current systems are designed to keep the blue box (as it is).”


 


Barone said the district had to throw out preconceived notions: “Let’s have a new lifestyle…you have to rethink and recycle our community. It is something done over time, otherwise you zig zag back and forth…you find common goals and reach common ground.”


 


Process


 


The “leader into the future” said the next step after a strategic plan is arrived at would be to establish a “framework for decision-making,” “align resources” for the achievement of the strategic plan, while discarding courses of action that would not fit in with that strategic plan. (“You have to be able to say no.”)


 



Barone pointed out how organizations change: the key is in the implementation of the Strategic Plan with Strategies, a way to measure the effect of those strategies (long a bone of contention between the White Plains Board of Education and the District Administration), and the Action to put the Strategic Plan into Effect. Barone said it was important to adjust the implementations in view of the results.


 


Barone said he was looking for citizens for the committees and the Strategic Plan Core Team, who “had a high degree of credibility, respected by people” and who were not “big mouths,” and “people of good will, ” without perceived positions, and persons “who feel they still have a lot to learn, and know the difference between a conversation and a debate.”


 


Citizens were urged to all show up at the World Cafe Meeting January 24 to begin the process.

Posted in Uncategorized

Executive Spano Sends His Wish List to Albany.

Hits: 0

WPCNR COUNTY CLARION-LEDGER. From Westchester County Department of Communications. January 8, 2007: Proposals to give tax relief to county property taxpayers and to better ensure public safety dominate the list in a proposed state legislative package that County Executive Andy Spano released today.


Highlights of the package include proposals:


·        to reform  the pistol-permit licensing process,


·         to decrease distracted driving by teens by barring them from using, while they drive, any cell phone or mobile device  (including hands-free),


·         to continue the cap on Medicaid costs and to add a new cap on costs of programs to educate handicapped pre-schoolers,


·        to require the state to issue a fiscal statement on any proposal that might impact local governments,


·        to strengthen the county’s ability to go after dead-beat parents.


 


 


The package has been sent to the county Board of Legislators for review and additions. It will then be given to the county’s Albany delegation as a joint package from the county executive and the county legislature.


 “Each year we closely examine what actions we should advocate for on the state and federal levels,” Spano said. “This package includes some new proposals and some that we have sent to Albany in the past. We know some proposals take time to accomplish. I am hopeful that Albany will be receptive to our many ideas that will protect public safety and give our residents critically important tax relief.”


 


Here are some of the specifics:


 



  • Extension of the county’s Property Tax Stabilization and Relief Act: This 1.5 percent sales tax has t

since its inception in 1992 provided revenues of $541 million to the county, $692 million to municipalities and $235 million to school districts for a total of $1.5 billion. Without an extension, this sales tax would expire and the county, local governments and school districts would have to raise property taxes to make up the revenue.


 



  • Pistol permit licensing: Currently, the process for issuing licenses to carry and possess firearms in  Westchester is administered by the office of the County Clerk despite the fact that all background investigations, the bulk of the responsibility with respect to license applications, are performed by the County’s Department of Public Safety.  The purpose of this legislation is to transfer all aspects of the licensing functions relating to pistol permits to the Department of Public Safety. Consolidating all of the functions related to the issuance of a license to carry or possess a firearm in the Department of Public Safety is both efficient and sensible. The change is supported by the County Clerk Tim Idoni, District Attorney Janet Difiore and District Administrative Judge Francis Nicolai.


  • Teen driving: Westchester was at the forefront in the state – and the nation – in adopting a law that banned the use of hand-held cell phones by drivers. Spano would like to go further by banning the use of any cell phone or any mobile devise (hands free or otherwise) by drivers under the age of 18. According to auto industry research, teen drivers are four times more distracted than adults by cell phone use. As a separate but related measure, Spano is proposing to increase the number of supervised driving hours required before a teen may get a driver’s license.


  • Underage drinking: Spano is continuing to advocate for a number of proposals aimed at reducing underage drinking. These include ones to suspend the liquor and lottery licenses of merchants who sell  alcohol to minors and to expand penalties for underage drinking.  


  • Fiscal disclosure notes: Each year the state passes numerous bills that have a financial impact on local governments and local property taxpayers. There is currently no requirement that the local fiscal impact of a bill be analyzed in any systematic way. This proposal would require that every proposed state law  that would affect the revenues or expenditures of local governments include a written statement fiscal impact statement. In 2004, County Executive Spano issued an executive order requiring that a fiscal impact statement accompany all legislation submitted by the county administration.  

 



  • Medicaid cap: Spano worked hard to get the state to enact a cap on the costs to local governments of Medicaid, and this has provided significant relief to county taxpayers and stabilized future growth in expenditures. The Medicaid cap must be permanently authorized in statute. This cap has already helped counties such as Westchester stabilize property taxes.


  • Other caps: Similar to the Medicaid cap, Spano is calling for a cap on the costs to local governments of the state- and federal-mandated programs to educate handicapped pre-schoolers. Between 1997 and 2007, the cost of this program tripled, from $25.9 million to an estimated $83.1 million. The burden on Westchester property taxpayers increased even more dramatically — by 3.6 times. The tax levy burden shot up from $10.8 million to $39 million in this ten year period, a 261 percent increase


  • Medicaid tracking and health insurance: A county survey of employed Medicaid recipients released last year revealed that many are not provided adequate health insurance by their employers and have turned instead to the government for health care, at an estimated cost to Westchester taxpayers of $11.5 – $34.5 million. Spano wants the state to better track this information so appropriate legislative remedies can be found.


  • Deadbeat parents: Westchester has an aggressive approach to finding deadbeat parents using telephone records. This proposal would ask the state to take the lead in expediting the release of these records. 
·        Wireless network security: Westchester last year adopted a unique local law to require that commercial 
entities that provide public Internet access to the public via wireless or local area network connections provide 
minimum security measures to prevent the disclosure of electronically stored personal information. 
Spano believes the state should adopt a statewide law similar to that of Westchester.
·        Sex offenders:  Spano reiterated a call for a law that would allow convicted sex offenders to be 
held in civil confinement. 

Posted in Uncategorized

User Group Committees Named for Stadia, Post Rd. Where Will Tigers Play?

Hits: 0

WPCNR SCHOOL DAYS. By John F. Bailey. January 8, 2007: The Superintendent of Schools released to WPNCR, last month, the makeup  of the “User Group Committees” to obtain school personnel input on the conversion and construction of the two district athletic stadiums, Loucks Field and Parker Stadium.



Loucks Field Renovation Committee Formed on the Loucks Makeover: two sets of metal bleachers seating 3,250 (not 2,500) with press box, lights,. locker rooms, artificial turf system and 10-lane track on the straightaway. Cost: $ 6 Million (Approximate)Photo, WPCNR News.



 


Parker Stadium Construction: New set of metal bleachers, seating 1,300 with press box, plus installation of synthetic turf and running track. Cost: $3.4 Million. (Approx.) Photo, WPCNR News.


The User Group Committee on the Fields consists of  (from the school administration): Superintendent Connors, a school board member, Triton Construction (the Managing Contractor) Fred Seiler, Assistant Superintendent for Business, Mike Lynch, Facilities & Operations, Ivan Toper, Principal, White Plains High School, Russ Davidson (architect, Nick Panaro, WPHS Athletic Director, Jody Cole, Health & Physical Education, Tom Eaton, House Administrator, Fred Singleton, Track Coach, Michael Stevens, Head Football Coach, and from the community: Charlie Norris (parent), Chuck Stogel (WPHS Athletic Fund), one male WPHS student and one Female WPHS Student to be selected by the Principal.


 


The Post Road School construction User Group Committee is made up of: Mr. Seiler, Mike Lynch, Russ Davidson, Triton Construction and Superintendent Connors, and a member of the Board of Education. Representing the Post Road School are: Laura Havis, Principal, Jodie Nestie, Assistant Principal, Susan Fiorella, Office Manager, Jean Nicastro, Kindergarten Teacher, Lori Mollo, 1st Grade Teacher, Kristine McMath, 2nd Grade Teacher, Mary Marquis 3rd Grade Teacher, Anthony Russo, 4th Grade Teacher, Franklin Cromer, 5th Grade Teacher, Wendy Gussack, Special Area. Parents include Rose Lovitch and Joretta Crabbe. Rounding out the Post Road group is Lorraine Seico, CSEA Representative.


 


 


 


Issues to Consider


 


Issues WPCNR has identified as being critical to the athletic field construction, include,


1. Selection of the length of artifical turf “grass blade,” compatible with all four sports: soccer, lacrosse, field hockey and football;


2. How the field will be permanently marked, whether lines will be interchangeable or permanent (so it does not become a dog’s breakfast of line markings);


3. Location of field event facilities at the high school (whether or not javelin, shot put, hammer throw can be staged on aritificial turf because of potential damage to the field from impact);


4. Cosmetic renovation of the field house adjacent Loucks Field, currently not included in the  $6 Million cost.


5. Completion dates.


 



 


A FieldTurf installation in Libertyville Illinois, showing how soccer and lacrosse markings (in orange) are integrated into the “blade” turf. Photo Capture from Libertyville High School site.


 


Where Will Football Be Played As Field Construction Continues Through Fall.


 


Russell Davidson, of Kaeyer Garment & Davidson, the architects has set back the dates when Loucks and Parker will be completed until before Thanksgiving, raising the issue of where the White Plains High School and Junior Varsity and the various “feeder” football teams will play football prior to Thanksgiving. Nick Panaro, WPHS Athletic Director, told WPCNR last month that Archbishop Stepinac was being considered.  Throughout the process during which the $69.6 Million school construction project was being promoted and explained to the community, the football fields had always been promised to be done over the summer of 2007 to be completed in time for football season.


 



The majestic ancient sweep of Parker Stadium Sunday afternoon. The concrete and stone structure is said to be unsafe, the bleachers in need of replacing, and deteriorated stairs and locker rooms. The old structure is said to be impossible to make disabled accessible. It will be replaced by a metal bleacher structure with a press box. Artificial turf would be installed on the grass field with a rubber surface walking track — but is not expected to be completed until just before Thanksgiving — leaving the WPHS Tigers to search for a place to play home football games.  Photo, WPCNR News


 


 


At Post Road School, issues that might be considered are:


1. Size and locations of classrooms. (Pretty much set).


2. Recreation Issues when outside recreation ares are to be taken out of commission for construction of the school.


3. Auditorium facilities — lighting, audio, production facilities, size.


4. Library/media center amenities and equipment.


5. Drainage design, so current leaking problems do not recur.


6. Parking during construction (2008-2009)


 


 


The User Group Committees Function.


 


The “UGC’s” are described as “providing input to the design of each project and will review interim sketches. Their role is advisory to the Superintendent and Board Finance Committee. The UGC’s for the other projects: District-Wide Roofing, District-wide Infrastructure, Mamaroneck Avenue Additions & Alteraons and White Plains High School Alterations will be formed when those projects begin.


 

Posted in Uncategorized