Hits: 0
WPCNR SOUTH END TIMES.By John F. Bailey. January 29, 2011 UPDATED WITH NEW PIX, DETAILS MIDNIGHT EST:
Over 200 persons (and counting as 2:30 P.M.) had toured a state-of-the-art, thorough presentation of the proposed new campus for the French American School of New York at the former clubhouse of the Ridgway Country Club, purchased by the school one week ago.

The new French American School of New York Campus seen from Ridgway & Hathaway Lane

OVERVIEW of the Ridgeway Country Club Property,showing proposed school campus to the south side on Ridgeway Avenue and scool fields along Hotel Drive. The campus portion is shown enlarged below.

The Overhead View of Proposed FASNY Campus
Ridgeway Avenue is at top RIGHT–Street at LOWER RIGHT is Murchison Place. Propsed Buildings (in tan)to be built are,top left is the ELEMENTARY SCHOOL; BUILDING in Center is the Middle Scool. The High Scool is to be housed in a renovated Ridgeway Clubhouse on Ridgeway. The building at bottomis a proposed gymnasium and theatre.
Attendees learned the school has changed its original plan where a school was to be placed on

Three-quarters of the club grounds (darker gray and dark green shading), are planned to be given over to the city in an arrangement to be determined,as open space.
Mischa Zabotin,the school Chairman of the Board of Trustees fo the French American School of New York told WPCNR today the School planned on giving the property over to the city with no strings attached, and would not retain the rights to it for future expansion. Zabotin confirmed the school would pay no property taxes. He told WPCNR the turning over the land to the city was a value in and of itself.
Presentations through continuous video displays showed an analysis of how property values have increased near two private schools in White Plains, (Solomon-Schecter and the German School),and a unique traffic drive through video.

The striking series of traffic videos, shot during a school day between 7:30 AM and 8 AM showed a drive through shot through the windshield of an actual car showing real traffic on the key points around the property: Mamaroneck Avenue and Ridgeway; Ridgeway itself; North Street and Ridgeway.
This reporter noted moderate traffic especially on Ridgeway itself. This sequence appeared aimed at answering some critics of the proposal protests that traffic on Ridgeway is too heavy at the present time to handle the additional drop-offs planned between 7:30 AM and 8 AM.
No numbers were provided by the traffic expert attending videos, for how many buses and private cars would be dropping off at the school netween 7:30-8:A.M. Dropoffs are planned to be contained entirely behind the clubhouse, avoiding backup out onto Ridgeway, and avoiding cut-throughs on
A third lane on Ridgeway is planned to handle queing to be added to Ridgeway on the club property(paid-for by FASNY)on the club frontage out to the North South boundary of the club property approaching Murchison Place.

TIMETABLE:
Site Plan and SEQRA Scoping planned for this spring; Draft DEIS projected for this summer; decision on Special Permit Targeted for Summer 2012

THE OPEN HOUSE SCENE 12:15 PM SATURDAY



