Hits: 110
![](http://whiteplainscnr.com/wp/wp-content/uploads/2020/06/WP_20200623_08_52_58_Pro1-1024x576.jpg)
The Loucks Stadium synthetic turf field installed in 2006, is being reconstructed this summer with new synthetic turf. The cost is $1.1 Million, which was allocated as part of last year’s school budget. It is expected to be completed by mid-August.