IMG_0169

MORE REAL NEWS THAN REAL NEWS IS

WHITE PLAINS WEEK

THE AUGUST 26 PROGRAM

ON THE INTERNET NOW

RKOTower

wpweek for 8-25 has been posted  the youtube link is
 
 
the whiteplainsweek.com link is
 

JOHN BAILEY

JIM BENEROFE

PETER KATZ ON

1-OPENER

VIDEO COVERAGE OF MARIO CUOMO BRIDGE OPENING

3-SHOCKER OF THE WEEK

WINBROOK LAWSUIT SHOCKER OF THE WEEK

8-WP TEST SCORES ELA 8TH GRADE

LARGEST ADVANCE IN WHITE PLAINS SCHOOLS 8TH GRADE ENGLISH SCORES IN A DECADE

PLUS

NITA LOWEY DRAWS BUDGET LINE 

JERRY LEWIS VIDEO

DICK GREGORY COMMENTARY

THE ASTORINO-BORGIA DUSTUP

THE DEBATE WHERE THE CANDIDATES WERE NO SHOWS

AND TRUMP THE PRESIDENT

Posted in Uncategorized

COUNTY RECORDS FIRST WEST NILE CASE OF THE YEAR

 WPCNR HEALTH ADVISORY. From the Westchester County Department of Health. August 26, 2017:

Westchester County has learned of its first human case of West Nile Virus this year, which was confirmed in a 63-year-old Briarcliff Manor resident who had been hospitalized, and is now recovering at home.

The Westchester County Department of Health found signs of mosquito breeding activity around the resident’s home and removed them.

“Tthis first case of West Nile Virus should serve as a reminder to residents to take precautions against mosquito bites by removing standing water from their property after it rains and using repellents when they spend time outdoors, especially from dusk to dawn, when mosquitoes are most active,” said Sherlita Amler, MD, Commissioner of Health.

The Health Department prepared for the mosquito season by educating the public through news releases and Keep Healthy and Bug Off messages distributed through flyers, social media, and on our website, by giving fathead minnows to residents with ponds to reduce the mosquito population and by evaluating and treating as needed with larvicide all catch basins on county and municipal roads throughout Westchester. Throughout the season, the Department also traps and tests mosquitoes to track the presence of mosquito-borne viruses in the county. West Nile Virus was identified in two local mosquito batches starting July 18. Manual pdf

West Nile Virus infection most often causes a mild or moderate flu-like illness, but can be more serious particularly for people 60 and older, and  those with other health complications. No residents were diagnosed with West Nile Virus last year, but from 2010 to 2015, two to four residents were diagnosed each year and all recovered.

            To reduce the chances for mosquitoes to breed and bite around your home, watch Assistant Commissioner Peter DeLucia in this brief video on the Department of Health website at http://health.westchestergov.com/west-nile-virus and follow these tips:

  • Avoid the outdoors in the late afternoon and early evening when mosquitoes are active and feeding, and use insect repellents when outdoors during these times. Be sure to follow the instructions on the label.
  • Adults can apply insect repellents with up to 30 percent DEET on infants over two months of age by applying the product to their own hands and then rubbing their hands on their children. Manual pdf Products containing DEET are not recommended for use on children under two months of age.
  • Wear protective clothing, such as long pants, long-sleeved shirts and socks, when outdoors, especially in areas where mosquitoes are active and feeding.
  • Check around your property for tin cans, plastic containers, ceramic pots or similar water-holding containers that should be discarded or turned over to prevent collecting water.
  • Check and remove standing water from children’s toys and play houses left outside.
  • Remove discarded tires.
  • Drill holes in the bottoms of all recycling containers that are left outdoors.
  • Turn over plastic wading pools, buckets and wheelbarrows when not in use.
  • Change the water in birdbaths at least twice weekly.
  • Keep storm drains and gutters clear of leaves and debris. Manual pdf
  • Even with the swimming season over, continue to chlorinate swimming pools, outdoor spas and hot tubs until properly winterized or drained for the season.  Also, if not chlorinated, drain any water that collects on their covers.

Residents who notice large areas of standing water on public property should report this to the Westchester County Department of Health at (914) 813-5000.

###

Additional news available at health.westchestergov.com/health

Connect with us on Facebook: https://www.facebook.com/wchealthdept

                                                          Follow us on Twitter: @wchealthdept

Posted in Uncategorized

Governor Cuomo Announces Opening of the Mario M. Cuomo Bridge

12-TAPPAN ZEE

WPCNR ALBANY ROUNDS. From the Governor’s Press Office. (Edited) August 24, 2017:

Governor Andrew M. Cuomo today announced the opening of the first span of the Governor Mario M. Cuomo Bridge, an iconic twin-span cable-stayed crossing that will serve the Hudson Valley for the next century.

The Governor commemorated the milestone with a ribbon-cutting ceremony that featured more than 800 dignitaries and residents from Rockland and Westchester counties on the cable-stayed area of the first span.

The construction project is one of the largest in the nation and the biggest in the history of the New York State Thruway Authority. Four lanes of Rockland-bound traffic will begin crossing the first span late Friday night into Saturday morning.

“The new Mario M. Cuomo Bridge is much more than a magnificent, cutting-edge structure, it is a symbol for this state and this nation. The opening of this new span shows the world that we have our energy and our boldness back, that we will continue to accomplish greats things, and that we are building bigger and better than we have in decades,” Governor Cuomo said. “Excelsior reminds us that the motto of this state says reach even higher, and we’re not only building a new bridge with this in mind – we are building a new state and a stronger economy. This historic project is providing quality jobs, hope and opportunity to both residents and visitors of this state, and I look forward to future generations of New Yorkers crossing the Hudson River on this new bridge for the next 100 years.”

Governor Cuomo drove on the new bridge span in a 1955 Corvette with Armando “Chick” Galella, who drove the same model year Corvette as part of the inaugural procession that crossed the Tappan Zee Bridge on December 15, 1955. The Sleepy Hollow resident is a veteran and Bronze Star recipient who survived the December 7, 1941 attack on Pearl Harbor.

The Governor Mario M. Cuomo Bridge will partially open to four lanes of Rockland-bound traffic overnight on Friday, August 25, weather permitting. For the next few months, northbound/westbound drivers on the New York State Thruway (I-87/I-287) will cross the Hudson River on the new bridge, while southbound/eastbound drivers will use the old bridge, each having four traffic lanes available. Later this fall, the new bridge will completely replace the 62-year-old Tappan Zee Bridge when four lanes of Westchester-bound traffic are also shifted onto the first span.

At Governor Cuomo’s direction, the New York State Thruway Authority has managed the bridge replacement project since 2013 with two fundamental objectives – first, to fully open the bridge to traffic in 2018, and second, to finish the bridge at or below the budgeted cost of $3.98 billion. Currently, the project remains on budget and on schedule, as construction of its second span continues to progress.

After all traffic has been shifted onto the first span, design-builder Tappan Zee Constructors will demolish the landings of the old bridge, which occupy the same footprint of the second span, and connect the second span to land. When completed, drivers will reap the full benefits of the 3.1-mile twin-span, which will include:

  • Eight general traffic lanes;
  • Four breakdown and emergency lanes;
  • Space for future bus rapid transit and commuter rail;
  • A bicycle and walking path with six unique viewing areas;
  • Cashless tolling; and
  • Energy-efficient LED lighting.

The original Tappan Zee Bridge, linking Rockland and Westchester, opened in December 1955 and there are now more than 140,000 vehicles crossing it daily.

As the first cable-stayed bridge ever built across the Hudson River, the new Governor Mario M. Cuomo Bridge uses steel cables placed at an angle to connect the bridge deck to vertical towers that extend high above the roadway. The bridge features eight 419-foot towers standing at a five-degree angle, and has a total of 192 stay cables that would stretch 14 miles if laid end-to-end. More than 110,000 tons of all-American steel is being used to build the bridge, and approximately 7,000 people have contributed to the project to date, totaling nearly 9 million work hours.

Posted in Uncategorized

Mario M. Cuomo Bridge Opening Ceremony Officially Sets Stage for Opening of the Bridge Westbound Friday evening approximately 9 P.M.

WPCNR BRIDGE OVER TROUBLED WATER. From the Westchester County Association and the New NY Bridge website. August 24, 2017:

At today’s ribbon-cutting ceremony for the first of two 4-lane spans of the new Gov. Mario M. Cuomo Bridge, WCA President & CEO Bill Mooney, who gave remarks and introduced Congresswoman Nita Lowey, said “here in the mid-Hudson Valley, new and better transit options will have a ripple effect throughout the region, fueling continued economic growth and creating jobs and opportunity.”
According to Governor Andrew Cuomo, the $4 billion bridge will be paid for by a $1.6 billion, long-term, low interest loan through TIFIA, and $2 billion in bank settlement funds, with the balance coming from Thruway Authority bonds, which derive their funds from tolls. (Tolls will not be increased before 2020.) The new state-of-the-art bridge will significantly improve the flow of freight through New York, including faster shipping times and lower costs for businesses throughout the entire Northeast Corridor.

NYbridge_13lr

This aerial photo, taken in June, shows where the first span of the new bridge will connect to the New York State Thruway in Westchester County.

When is the first span of the new bridge opening?
The new bridge will partially open to traffic during the overnight of Friday, Aug. 25, weather permitting. The Thruway Authority will release details about the traffic shift in the coming days. Motorists will also be advised via Variable Message Signs along the New York State Thruway and highways in the region and Thruway Highway Advisory Radio will soon begin broadcasting updates.

Posted in Uncategorized