CUOMO TO SUNY: MAINTAIN OPEN ADMISSIONS POLICIES AND EXPAND THEM

WPCNR ALBANY ROUNDS. From the Office of Governor Andrew M. Cuomo. 11 A.M. E.D.T. July 5, 2018:

Governor Cuomo today issued an open letter to SUNY Board of Trustees Chair H. Carl McCall and CUNY Board of Trustees Chair William C. Thompson Jr. directing them to maintain their diversity and inclusion plans after the Trump administration rescinded guidelines on using race in college admissions. The letter directs the Chairs to continue existing policies that promote racial diversity and inclusion and to prepare a report by August 15 on how they will further expand and increase diversity on campuses.

The full text of the letter is available below:

Dear Chairman McCall and Chairman Thompson,

The Trump administration’s move to rescind the guidelines on using race in college admissions is a blatant attempt to limit the participation of minorities in higher education.  It is part of a troubling trend by the President and his administration to alienate minorities and build walls to diversity and equal participation in society

As you know, this issue has been going through the courts since 1978 (Regents of the University of California V. Bakke), most recently with the 2016 decision in Fisher V. University of Texas. The courts have determined that diversity is a valuable and allowable part of higher education.

New York’s two university systems have long been bastions of diversity and engines of social mobility. SUNY is nearly 45% minority and CUNY is 76% minority.  This diversity broadens understanding and breaks down barriers and stereotypes, and it ensures all New Yorkers have the opportunity to succeed.

In this state, we embrace diversity and we encourage it. I am directing you to continue your existing diversity and inclusion plans. The new federal action should have no bearing on admission policies and should not interfere with SUNY’s and CUNY’s commitment to a diverse and inclusive student body.

In addition, I am directing you to reexamine your existing plans to ensure these plans are furthering New York’s goals of diversity and inclusion. To that end, SUNY and CUNY should each prepare a report due by August 15, 2018 outlining how they will expand and increase diversity representation on our campuses.

The Trump administration wants to take this country backwards, but in New York we are moving forward. We will continue to work together to dismantle barriers to social and economic mobility and extend the promise of equal opportunity to all New Yorkers.

Sincerely,

Governor Andrew M. Cuomo

 

 

 

Posted in Uncategorized

Parking White Plains as of July 1, 2018: Photographs of the Day

WPCNR PARKING PHOTOTOGRAPHER. July 4, 2018:

If you’re thinking of stepping out tonight, you may want to be aware that in White Plains, parking on Independence Day is Free at on street meters.

It is not FREE in the municipal parking lots or the garages.

There were no welcoming signs on Mamaroneck Avenue to tell you parking was free on the street July 4. You had to read the fine print in the on-street meters below, though it is hard to read the first line through the scuffed-up glass:

IMG_8903

At the municipal parking lots, there were these warning signs below that you have to pay 24/7/  7 days week including holidays:

IMG_8906

Inside the municipal parking lot  kiosks (below) there were these warnings with the new parking rates which went into effect July 1:

IMG_8907

Here is the notification of the new city parking policies and rates below. 

IMG_8908

Got it?

The sign reads:

“Please also note that downtown on street meter rates are also being raised to $1.25 per hour on July 1,2018. On street time limits will remain in effect and willl be enforced. Parking meter rates at all other off-street facilities will remain the current $1.00 per hour. Specifically, the rate across the street will remain $1.00 per hour. Long-term parkers should utilize that facility.”

The new rates are part of the city effort to charge more for convenient, close-to-downtown parking than for parking in outlying city lots, introduced several months ago, now being implement

Posted in Uncategorized

Redlighting White Plains New York USA

IMG_2934

Warning sign on southbound Mamaroneck Avenue just before the Redlight/video camera at the Bryant Avenue intersection in White Plains, look for these at the intersections below. Photo sent in by a WPCNR CitizeNetReporter Observer.

WPCNR TRAFFIC TALK. July 4, 2018:

On its website the City of White Plains has posted an explanation of how motorists can avoid getting a ticket issued from the new City Redlight camera/video devices at  6 intersections in the city.

The intersections are:

SB Mamaroneck Ave @ Bryant Ave

EB Main St @ Martin Luther King Jr Blvd

NB Bank St @ Hamilton Ave

WB Hamilton Ave @ Bank St

WB Westchester Ave @ South Kensico Ave

SB North Broadway @ Hamilton Ave

The following photos of the press release on the city website  posted Monday, explain how motorists avoid getting tickets approaching a red light.

Of note:

1. Motorists can still make a right on red after a full stop before the crosswalk/stopline.

2. Police will review all photographs before violation notices are issued.

3. The city says the system is being instituted as a safety device, but gives no figures showing whether redlight accidents are up substantially.

4. The system apparently will be in effect through 2020, when the legislature will take the redlight authorization legislation passed in 2015 under review for renewal.

5. The cameras are operating as of now, but in a transition period, when violations will be sent to motorists, but no fines due. The transition period will last until August 1 when the violations motorists receive will be subject to fines.

Here is what the city says about how to avoid getting redlight photo tickets.

IMG_8899

IMG_8901

IMG_8900

IMG_8898

Posted in Uncategorized

Playland Boardwalk Repairs Completed, Opened After 6 Years. Repairs Complete. $4.6 Million Cost Funded by FEMA

Playland After

WPCNR PLAYLAND GO ROUND. From the Westchester County Department of Communications. July 4, 2018:

Visitors today to Playland Park in Rye will once again enjoy magnificent views of Long Island Sound from the 700-foot long North Boardwalk, now that a capital replacement project has been completed, Westchester County Executive George Latimer announced today during a ribbon-cutting ceremony.

Ribbon2

            Latimer (center) was joined by County Parks Commissioner Kathy O’Connor, Commissioner of the Department of Public Works Hugh Greechan and Deputy Parks Commissioner Peter Tartaglia, to officially open the Boardwalk.

“I am pleased to welcome Westchester residents back to this very special section of Playland Park, which had been closed after Superstorm Sandy demolished the existing boardwalk in 2012,” Latimer said. “It’s been a long time coming, but the way this new Boardwalk is built, it will be here for a very, very long time to come.”

Playland’s shoreline sustained grave damage during Superstorm Sandy on October 29, 2012, with winds and tidal surges greatly damage the South Boardwalk, and completely demolishing and washing away the North Boardwalk.

The replaced boardwalk is built with 500-year storm resistant materials. The Boardwalk has been upgraded with steel piles replacing the former wooden ones, and a concrete substructure and platform to further stand up to the elements.

Like the Park’s South Boardwalk, which was repaired and reopened in 2013, the new boardwalk’s decking is made of Brazilian hardwood known as Ipe, which can last more than 30 years without warping and splintering.

New wrought-iron fencing on both the water’s edge and the park side of the walkway has been installed, along with brand-new, historically correct benches and lighting to comport with the Park’s Art Deco architecture.

The completion of the North Boardwalk reconstitutes Playland’s scenic Seaside Walk that runs along Long Island Sound and affords beautiful vistas. It is a 3/4-mile path that starts at the South Boardwalk and ends at the North Boardwalk near Playland Lake.

The cost of the project was $4.6 million for design and construction.

Posted in Uncategorized