JANUARY 27– 2:45 PM– NUMBER OF UNEMPLOYED INCREASES 3RD STRAIGHT MONTH IN HUDSON VALLEY

Hudson Valley Region:

The December 2025 unemployment rate for the Hudson Valley Region is 3.2 percent.  That is down from 3.4 percent in November 2025 and up from 3.0 percent in December 2024.

In December 2025, there were 39,600 unemployed in the region, down from 42,000 in November 2025 and up 36,700 in December 2024.  Year-over-year in December 2025, labor force increased by 28,600 or 2.4 percent, to 1,237,900.

 

The Hudson Valley Region’s December 2025 unemployment rate (3.2 percent) is tied with the Long Island Region for the lowest rate among the 10 labor market regions in New York State.

  • Hudson Valley 3.2 percent
  • Long Island 3.2 percent
  • Capital Region 3.3 percent
  • Finger Lakes 3.7 percent
  • Central New York 3.8 percent
  • Southern Tier 4.0 percent
  • Mohawk Valley 4.1 percent
  • Western New York 4.1 percent
  • North Country 4.5 percent
  • New York City 5.4 percent

In December 2025, the lowest unemployment rate within the region (2.8 percent) was recorded in Putnam County.

  • Putnam County 2.8 percent
  • Rockland County 3.0 percent
  • Westchester County 3.1 percent
  • Dutchess County 3.2 percent
  • Ulster County 3.5 percent
  • Orange County 3.6 percent
  • Sullivan County 3.6 percent

Posted in Uncategorized

JANUARY 26– NEW! 12 NOON WHITE PLAINS DPW TRAFFIC SNOW REMOVAL REPORT FROM THE CITY OF WHITE PLAINS

 

GOOD AFTERNOON  WHITE PLAINS RESIDENTS.

YESTERDAY’S STORM BROUGHT US  14-15 INCHES OF SNOW!

OUR AMAZING DEPARTMENT OF PUBLIC WORKS CREWS WILL CONTINUE THEIR SNOW REMOVAL OPERATIONS THIS WEEK.

CURRENTLY, THEY HAVE FINISHED SALTING THE MAIN ROADS AND ARE CONTINUING TO SALT THE SECTIONS. SHOULD HAVE BEEN COMPLETED THIS MORNING.

DPW IS PREPARING TRUCKS FOR SNOW REMOVAL OPERATIONS TONIGHT IN THE  DOWNTOWN STARTING WITH MAMARONECK AVE AT MAIN STREET AND WORKING THEIR WAY DOWN THE AVENUE. THE CITY’S PAYLOADER OPERATORS WILL BE REMOVING LARGE SNOWMOUNDS AT TRAFFIC ISLANDS AND NEAR TURNING LANES WHERE THEIR OUR SIGHT LINE ISSUES.  

THIS AFTERNOON, DPW WILL BEGIN CLEARING SNOW FROM CROSSWALKS.

FOR THE REMAINDER OF THE WEEK. DPW WILL CONTINUE ITS SNOW REMOVAL OPERATIONS THEN TRANSITION TO CLEARING PARKING LOTS WHERE SNOW WAS PILED UP FROM PLOWING.

GARBAGE OPERATIONS ARE PROCEDING ON THE NORMAL SCHEDULE.

YOU JUST CAN’T HOLD DPW DOWN!

(Editor’s Note: This is a breakthrough in communications initiated by the new  Mayor Justin Brasch administration: timely in real time report on progress on clearing city roads  of the largest snow storm I can remember. This morning the roads  in the neighborhoods had preliminary clearing in place and by noon my neighborhood  was done)

Posted in Uncategorized

JANUARY 25– FLAKE-BY-FLAKE SNOW REPORT: THE BIG WHITE CONTINUES AT 5 INCHES AN HOUR APPROXIMATE PACE

WPCNR WEATHER. jANUARY 25, 2026 4 P.M. UPDATED 10:40 P.M.

At the 10:40 PM hour, a fine rain is now falling, accumulation has essentially topped out in what has been one of most intense snowstorms afflicting White Plains in years.

More shoveling awaits us tomorrow morning. White Plains Schools are closed Monday.

After a second clearing of snow, it is clear the pace of the largest snowstorm to hit White Plains in two winters, by my recollection, that the powdery consistency of the white event aided by its organization and intensity of flake ordinance is continuing to replace snow already plowed, shoveled or snowblown away at the same  speed as it is removed.

It took your shoveling reporter,  John Bailey, another hour and 15 minutes to clear sidewalk and 90 foot driveway refilled with the windblown white .

My surprise was after completing shoveling in an hour 15 minutes, 1 hour later the drive was refilled again.

The rough total after two snow removals was 12 inches, and seeing another 2 inches have happily refilled the driveway. We are going to be close to 16 inches or more.

 

The growing problem, the DPW faces is the powdery  drifting llightness of the snow. It does not pile or collect well. Walks  residue has now piled to about  3 feet. And it has a tendence to collapse or create mini-avalanches.

 

If this stops by midnight the shovel jobs tomorrow will be another chore.

Posted in Uncategorized