FASNY Clarifies: Max Traffic is 2,504 in Peak Times. None in Off-Peak.

WPCNR SOUTH END TIMES. September 28, 2011 UPDATED 2:20 P.M. E.D.T. With Pictures of the Parking Plans available by pressing “READ On”:


The maximum traffic increase expected if the French American School of New York is opened on the former grounds of the former Ridgeway Country Club is 2,504, a figure based totally on expected traffic in the peak morning and afternoon hours, a FASNY spokesperson wrote today in a statement.


Geoff Thompson released this statement from the school to WPCNR:


“Previous estimates of peak hour traffic as shown in the Environmental Assessment Form were 1,170 trips. This would account for all students and staff and includes trips into the school and out of the school (for the parents and buses that would leave the students).


Under this conservative analysis, there would not be additional trips during off-peak hours.


FASNY’s consultants have updated the peak hour estimate to 1,252 trips in the peak hour, but are seeking to refine that number further with additional data from FASNY. Complete details will be provided in the Environmental Impact Statement.


Over the course of the entire day, FASNY would add approximately 2,504 trips total to Ridgeway – a road that currently carries approximately 5,000 vehicles on an average day. The total of 7,500 vehicles on Ridgeway would be only 40% of the design capacity of the road.”


(Editor’s Note: WPCNR estimates the capacity of Ridgeway to be 19,000 vehicles a day. Previously it was unclear from the Monday evening presentation whether the original figure of 1,170 trips was total peak traffic, with 1,334 additional off-peak vehicles making up the 2,504 estimated maximum increased traffic stated in the accompanying chart below. The chart was shown Monday evening in the untelevised, uninterneted, unbroadcast Common Council work session Monday evening.)



THE INCREASED TRAFFIC STORY ACCORDING TO THE FRENCH AMERICAN SCHOOL OF NEW YORK. Photo, the CitizeNetReporter.



The Plan as Presented Monday evening at the Common Council “Work Session.” Arrows indicate the types of buildings. Ridgeway is the road running on the right of the overview.



Exiting Vehicles depart via Hathaway Lane (road between large elementary parking lot) back onto Ridgeway. No exiting traffic will be allowed to turn North on Hathaway towards Bryant Avenue.



Cars, School Buses at Peak Hours AM & PM will be contained within the drive in entrance (“Main Entrance Driveway”) winding deep behind the site to two three main parking areas.



A CLOSER LOOK: cars wend their way in past Gymnasium/Performing arts around the Middle School(upper right of picture) (located in former Ridgeway clubhouse (not shown) across the courtyard at bottom of picture, or the Middle School located upper right.



First Parking and Dropoff area serves High School accessable from the courtyard and the Middle School.(Check overview of the Buildings below:)



Parent cars and buses bound for the Elementary School then cross Hathaway Lane, shown in the left third of the picture below to enter parking area in front of elementary school to drop off children. The parking area below is located roughly where the former golf cart storage was at the former club.


Posted in Uncategorized

City Promotes Youth Bureau Deputy Commissioner to Planning Dept.

WPCNR CITY HALL CIRCUIT.September 28, 2011 UPDATED September 29, 2011:


The city has promoted Linda Puoplo, previously Deputy Commissioner of the White Plains Youth Bureau, to the position of Deputy Commissioner of Planning, Karen Pasquale, Senior Advisor to the Mayor, confirmed to WPCNR Tuesday.


Ms. Pasquale said Ms. Puoplo had been earning $111,000 in the Youth Bureau position, and would be earning $120,000 in her new Planning Department Deputy Commissioner slot. Pasquale described her as “very skilled and qualified.”


Susan Habel, Commissioner of Planning said that Rod Johnson who is s paid consultant in the Planning Department, serving as city Environmental Officer, would continue in his assignment.


Ms. Pasquale said that Ms. Puoplo’s position in the Youth Bureau would not be filled.


WPCNR has learned that Ms. Puoplo has been primarily responsible for applying for grant funding at the Youth Bureau.

Posted in Uncategorized

City Schedules shorter FASNY Presentation for Monday RIDGEWAY Scoping Opportunit

WPCNR CITY HALL CIRCUIT. September 28,2011:


 The general public watching next Monday evening’s Common Council meeting will have the opportunity to see the French American School of New York presentation given last Monday evening at the Common Council worksession.


According to the Senior Advisor to the Mayor, Karen Pasquale, the school will present a “shorter” performance of their 1 hour and 30 minute presentation Monday, prior to the first scopping session to gather questions and concerns of interested parties and citizens that the French American School of New York should address in their preparation of the Draft Environmental Impact Statement.


The city did not televise the Monday FASNY presentation either on Government Access Channel  or on the internet in simulcast on the city website which they could have done because the work session was held in the Common Council chambers. The Mayor’s Office said it was not televised because it was a work session and work sessions traditionally are not televised.


Carl Albanese, a local videographer did tape record the Monday session and the complete FASNY presentation.


As a public service he has offered his tape of the meeting to the city for telecast in its entirety if they wish to present its extensive content to the public. He offered the tape at no charge, as a citizen public service. As of this morning, the city has not responded to Mr. Albanese’s offer, Mr. Albanese told WPCNR this morning.

Posted in Uncategorized

Multi-million $$$ City Closing of TCE-Ridden LandFill to Begin. Approval Soon

WPCNR THE GREEN NEWS. September 28, 2011:


New York State Department of Environmental Conservation press officer Wendy Rosenbach informed WPCNR the department will be giving final approval to a plan for the city to close the Gedney Landfill “shortly,” Rosenbach told WPCNR, with a few minor changes..


 


Final approval for capping the dump and prevention of TCE leakage into the Mamroneck River adjacent the dump, will allow Commissioner of Public Works Joseph Nicoletti to send the entire project out for bid, which has not been done yet, pending the final approval, (as recently told WPCNR by City Chief of Staff John Callahan).


 


Estimates for the closure plan two years ago set the cost to the city as $8 to $10 Million, which may raise city debt service in the new budget.


 


The Final Approval will also allow the city to begin its total resodding of the Our Lady of Sorrows baseball field adjacent the dump to create a soil buffer between the TCE-contaminated soil in the field and athletes playing on the surface.


 


 

Posted in Uncategorized